KTT06 Stjørdal Station

Project Period: 2025 - 2027

Project Description:

The project involves extending the track towards Værnes, adjusting track 2 and establishing a new track 3. A new island platform is being built, with a lift, shelter and benches, while the existing side platform is being upgraded.

A new, wide underpass is also being established, connecting Stjørdal town centre with Tangen. The underpass is designed for safe and efficient movement between the platforms and through the area.
The project also includes new water and wastewater infrastructure, a snow-melting system, power supply and a district heating substation.
‍
Contract type: Main contractor

Client: Bane NOR

Kontaktperson:

No items found.

Oppdragsgiver:

Keywords:
Baneservice

Prosjekt start/slutt:

Start:
Slutt:

Kontraktsum

Entrepriseform:

Aktuelt fra Baneservice

24.8.26

Baneservice to deliver track and technical installations for the new metro line Fornebubanen

Les mer
7.5.26

Measuring almost 50 metres, this is Scandinavia's first hybrid tamping machine

Les mer
5.6.26

Hove train stabling project certified BREEAM Infrastructure Excellent

Les mer
Se alle nyheter