Hove stabling facility
Start: September 2023
Completion: February 2026
Project Description:
The project involved building 16 stabling positions under live catenary, across 8 tracks. Connections to the Dovre Line are being established both to the south and the north, including a headshunt to the south. An upgraded junction to the Hove operations base and timber terminal is being adapted to the new facility. In addition, the existing catenary system between Hove and Fåberg is being upgraded.
The project covered the disciplines of:
- track
- catenary
- signalling
- telecom
- low voltage
- cable routing
- groundworks
- structures
- water and wastewater.
The work also includes the demolition of existing installations, cables, foundations and cable routing. On completion, the site compounds and affected areas will be restored to their original condition.
Multiconsult was the subcontractor for design, while Gjerdalen Entreprenør AS carried out the groundworks, structures and water and wastewater.
Contract type: Main contractor
Client: Bane NOR